TAX ID:0319636174 | FDI SINGAPORE:BETTER LINE PTE. LTD. | FOB • OEM • ODM STANDARD
HOTLINE: 0879 107 000 |
/
Trade Better Global Sourcing
RAPID R&D CYCLE: 48h CAD Blueprint Review • 14-Day Tooling & Sample • 35-Day Container Mass Production
STRICT MUTUAL NDA FOB Cat Lai / Ningbo
precision_manufacturing END-TO-END CONTRACT ENGINEERING & OEM/ODM

From 3D Concept to 40HQ Container Export. Synergizing Ningbo Tooling Speed with Vietnam Tariff Scale.

We engineer custom outdoor living furniture, fire pits, and commercial-grade camping equipment for tier-1 retailers and international brands. Our dual-hub architecture solves the global sourcing bottleneck: rapid die/mold fabrication in Ningbo within 14 days, followed by automated manufacturing and assembly in Ho Chi Minh City for 0% export tariff compliance into the US and EU.

R&D & TOOLING CAPACITY ACTIVE
Sample Lead Time 7 – 14 Days
Tooling & Mold Accuracy ±0.02 mm CNC
Monthly Mass Output 45 x 40HQ
Acceptable AQL Rate Major 1.5 / Minor 4.0
lock All engineering drawings, CAD step files, and brand assets are protected under bilateral NDA contracts executed by Better Line Pte. Ltd. (Singapore).
STANDARDIZED EXECUTION

Our 6-Step Engineering & Contract Manufacturing Pipeline

A transparent, audit-ready milestone roadmap that eliminates supply chain surprises from initial drawing to container seal.

1 DAY 01 – 02

Technical CAD & DFM Audit

Customer sends 3D CAD files (.STEP, .IGES) or physical samples. Our engineering team conducts Design for Manufacturability (DFM), stress simulation, and packaging optimization.

✓ Bilateral NDA Signed • DFM Feasibility Report
2 DAY 03 – 14

Rapid Prototyping (Ningbo Hub)

High-speed CNC aluminum tooling and mold fabrication in Ningbo. Golden sample produced, assembled, and express-shipped to your headquarters for physical inspection and fit testing.

✓ 1st Article Inspection (FAI) • Full Dimension Report
3 DAY 15 – 20

Lab Compliance Pre-Testing

Prototype subjected to mechanical load testing (EN 581-2), fabric flammability (CPAI-84), salt-spray corrosion (ASTM B117), and ISTA-3A drop test for e-commerce mail order carton integrity.

✓ Lab Pass Certificate • Drop Test Video Log
4 DAY 21 – 45

Pilot & Mass Production (VN Hub)

Tooling transferred to Cu Chi manufacturing complex. Robotic tube bending, automated laser welding, German powder coating, and specialized sewing lines scale output to full container capacity.

✓ In-line QC Checkpoints • Weekly WIP Progress Photos
5 PRE-SHIPMENT

AQL 2.5/4.0 Final Audit

Final finished goods inspected against approved master sample. Packaging, barcode scanning, carton drop, and visual cosmetic defects inspected before palletization. 3rd-party audits welcomed.

✓ Full Pre-Shipment Inspection Report (PSI)
6 EXPORT DELIVERY

FOB Logistics & 0% C/O Issuance

Containers loaded and sealed at our bonded logistics yard. Transported to Cat Lai port (HCMC) or Ningbo port. All export declarations, Bill of Lading, and C/O Form E / EUR.1 / CPTPP issued.

✓ Clean On-Board B/L • Preferential Tariff C/O
COLLABORATION MODELS

OEM vs. ODM: Choose Your Path to Market

Key Criteria OEM (Original Equipment Manufacturer) ODM (Original Design Manufacturer)
Design & Intellectual Property (IP) 100% Client-Owned. Custom molds, patented mechanisms, and trade secrets protected under NDA. Trade Better Open Library. Pre-tested designs with your custom branding, colorway, and packaging.
Development Timeline 45 – 60 days (Tooling, mold making, golden sample approval). 14 – 21 days (Immediate production run with existing certified tooling).
Minimum Order Quantity (MOQ) 1 x 40HQ Container per custom SKU (approx. 500 – 1,200 pcs). Flexible (Mix up to 3 SKUs per 40HQ container, from 200 pcs/SKU).
Best Suited For Established outdoor brands, enterprise retail chains requiring proprietary market differentiation. Fast-growing e-commerce sellers, catalog importers wanting rapid turnaround and zero tooling risk.
DIRECT ENGINEERING INTAKE

Initiate Technical Feasibility & Sample Quote

Our engineering office in Ningbo and HCMC will review your specifications within 48 hours.

verified_user Protected by Singapore Legal Arbitration & Bilateral NDA